- 01
Arrive with the notesKeys from the site office, bays 12–14 coned off, the vault inspected from its opening. The notes your procedure needs come up before the first structure.
- 02
Catch basins, one by oneCB-01 to CB-06, grate, sump and outlet. CB-04’s sediment reading reaches the line you set: attention needed, with a photo.
- 03
The vault, from the openingUV-01: standing water and the structure observed from the surface. No entry, so none is recorded. Routine.
- 04
The pond and its forebayWP-01: embankment, outlet riser, trash rack and spillway. Sediment building up in the forebay: attention needed.
- 05
Down to the outfallOF-01: riprap displaced and the bank eroded beside the apron. A deficiency, photographed where it was found.